📍 Depot: 16 Jesica Rd, Campbellfield VIC 3061
XTRUCTIONPTY LTD
Renovation Division

Full Architectural Transformations

Precision Structural Re-Engineering Workflows

From the initial demolition permit to complex dead-load restructuring via massive integrated steel beams, Xtruction manages high-end full scale residential transformations safely and transparently.

Phase 1: Diagnostic Structural Survey

Detailed on-site foundation analysis, lintel tracking, and structural loading calculations checking integrity limits beforehand.

Phase 2: Secure Stripping & Propping

Safe execution of all interior strip-outs using systematic hydraulic heavy-duty propping lines to prevent accidental alignment shifting.